A fence postscript

Unexpected project gets completed in jig time

Advertisement

Advertise with us

During a recent backyard deck upgrade and partial fence replacement project, the homeowners forgot to include one other section of fence that needed to be replaced. Luckily it was a fairly short section and I was able to squeeze the job into my summer schedule.

Read this article for free:

or

Already have an account? Log in here »

To continue reading, please subscribe:

Monthly Digital Subscription

$1 per week for 24 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*Billed as $4.00 plus GST every four weeks. After 24 weeks, price increases to the regular rate of $19.00 plus GST every four weeks. Offer available to new and qualified returning subscribers only. Cancel any time.

Monthly Digital Subscription

$4.75/week*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*Billed as $19 plus GST every four weeks. Cancel any time.

To continue reading, please subscribe:

Add Winnipeg Free Press access to your Brandon Sun subscription for only

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

No thanks

*$1 will be added to your next bill. After your 4 weeks access is complete your rate will increase by $0.00 a X percent off the regular rate.

During a recent backyard deck upgrade and partial fence replacement project, the homeowners forgot to include one other section of fence that needed to be replaced. Luckily it was a fairly short section and I was able to squeeze the job into my summer schedule.

To get the project done as efficiently as possible, I once again co-ordinated with a landscaping crew. I’ve learned from experience that the fence-building process is greatly expedited if the post holes are pre-drilled before my arrival. In this instance, however, I had to dismantle the section of old fence before the new post holes were dug. So, I arrived early the day the landscaping crew was scheduled to do their work, and luckily the old posts came out without issue.

Using a handheld post-hole digger and an eight-inch auger bit, the team systematically re-drilled the five post holes to a depth of roughly 42 inches. The outermost hole was a bit tricky, in that the old fence continued from that corner towards the backyard — a section that was not being replaced. So, we temporarily moved the leg of older fence away from the outermost hole. Once the holes were dug, that post was immediately set to level and secured using quarter down limestone gravel. Then we re-attached the old fence section to the new post.

Marc LaBossiere / Free Press
                                The L-shaped fence section, including the gate, was completed in less than a day.

Marc LaBossiere / Free Press

The L-shaped fence section, including the gate, was completed in less than a day.

Using a stringline, the elevation was marked along the top of the other new posts and the tops were cut off, except for the two set roughly 12 inches higher to create a threshold for the 36-inch-wide gate. Each post was set using limestone gravel. A 2 x 6 cap was created along the back section that pivots roughly 90-degrees toward the gate area, which also has a 2 x 6 cap at a higher elevation to ensure the gate remains rigid over time, during the swinging action of opening and closing. With the caps in place, the upper, middle and lower 2 x 4 horizontal supports were added between the posts, creating the sections upon which the 1 x 6 fence boards could be affixed. To mimic the previous fence section replacement, the 1 x 6 boards were mounted along the exterior of the fence frame, showcasing the main framework inside the fencing.

The gate was built to meet the opening of the gate posts with roughly a half-inch clearance on either side. Additional 90-degree hardware was added to strengthen the gate, including pre-mounted hinges for easier installation. Lastly, the latch and handle were mounted, with a string-pull latch on the gate’s exterior.

The whole job only took five hours from start to finish. Now, when you look at the house from the street, it is bookended with great new fencing.

RenoBoss.Inc@outlook.com

Existing post holes were re-drilled using a handheld digger with an eight-inch auger bit.

Existing post holes were re-drilled using a handheld digger with an eight-inch auger bit.

The custom gate was built on site using pre-fab hardware that will ensure it stays sturdy.

The custom gate was built on site using pre-fab hardware that will ensure it stays sturdy.

Report Error Submit a Tip

Renovation & Design

LOAD MORE